- 01
Design & requirement review
Review the physical sample, image, design, tech pack or customer concept.
- 02
Pattern making
7 pattern makers support product development and fit work.
- 03
Sample development
Sampling normally takes 5–10 days after inputs and requirements are confirmed.
- 04
Fabric & trim confirmation
Confirm materials, branding components and production requirements.
- 05
Cutting
Prepare approved fabric and cut panels for the production run.
- 06
Sewing
Assemble garments across 5 production lines.
- 07
Washing & finishing
Coordinate wash resources with stable family partners, then complete finishing.
- 08
Quality control
Inspect fabric, cut panels, sewing and post-wash garments. Every finished garment undergoes individual quality inspection before shipment.
- 09
Packing
Pack according to confirmed label and packaging requirements.
Capacity and timing
Plan around the approved style and order
Approx. 120,000 pcs and Approx. 3,500 pcs are stated operating capacities. Available capacity and exact lead time must be confirmed for each order.
Manufacturing evidence
Inside the denim production workflow
Real views from MISEN's Zhongshan manufacturing operations and the partner washing facility that supports the washing and finishing stage.
Partner washing and finishing
Inside a Partner Washing Facility
Washing is coordinated through partner facilities. These images show the working environment and garment handling at a partner facility.
Start with what you have
Discuss your denim project with MISEN
Share a sample, tech pack, image, design or product idea. We will review the requirements before confirming feasibility, MOQ, sampling and production.